Untranslated

Manufactur standard Oil Test Termination - HV Shielded Test Room – LINT TOP

Manufactur standard Oil Test Termination - HV Shielded Test Room – LINT TOP

Product Details

FAQ

Product Details

We continue to keep increasing and perfecting our solutions and service. At the same time, we operate actively to do research and enhancement for Automatic Skipping Machine, Copper Casting, Multi Wire Cable, For further queries or should you have any question regarding our products, please do not hesitate to contact us.
Manufactur standard Oil Test Termination - HV Shielded Test Room – LINT TOP Detail:

1. Introduction

The HV partial discharge hall is mainly used for power transformer, HV inductor, arrester, HV switch, HV XLPE cable and so on, the shielded room is used for avoiding electromagnetic interference which can affect partial discharge test.

2. Technical Parameters

Rated Voltage (kV)

±100-2000 (and above)

Exterior Dimension (m)

60*40*30(L*W*H)(bigger size is available)

Grounding Resistor

Requirement<1.0Ω

Insulating Resistance

≤10KΩ(measured after completing shielding room, insulating ground mainly used fro HV cable partial discharge hall, because there is a high requirement for partial discharge of HV cable with large capacity)

Partial Discharge

≤2.0 PC(Shielding hall partial discharge value is below 2 PC if equipment can reach below 2.0PC)

Magnetic Field

10kHZ attenuation 60dB linearity rise to 100KHZ, attenuation 100dB

Electric Field

From 1kHZ to 100kHZ attenuation 100dB


Product detail pictures:


Related Product Guide:

Our team through qualified training. Skilled professional knowledge, powerful sense of support, to satisfy the support desires of consumers for Manufactur standard Oil Test Termination - HV Shielded Test Room – LINT TOP , The product will supply to all over the world, such as: Sevilla, European, Denver, Our company is working by the operation principle of "integrity-based, cooperation created, people oriented, win-win cooperation". We hope we can have a friendly relationship with businessman from all over the world

FAQ

Q: Can I visit your factory?

A: All the customers from both home and abroad are warmly welcomed to visit our company and factory.

Q: Do you supply the installation and commissioning?
A: Yes, we do as followings:
-As soon as customer informed us the machines are put in the right place, we will send both mechanical and electrical engineer for machine start up.
-No-load testing: After machine installed completely, we make no-load testing first.
-With-load testing: Usually we will can produce 3 different wires to make load testing.

-Acceptance report: After the buyer confirms that machine can reach all specification under contract, the acceptance report will be signed for our record that machine will be in guarantee period.

Q: What information should I offer to get a detailed quotation from you?
A: For single machine: Usually we need to know inlet wire size, outlet wire size to be produced, productivity, pay off and take up size to choose the right machine.
For new cable plant or new cable production line, we need to know the datasheet of cables to be produced, the productivity, the standards to be followed, etc to design all machines needed.

Q: Can you supply the auxiliary equipment along with the machines?
A: Yes, definitely.
We has supplied heat exchanger, copper/aluminum powder filter machine, cooling tower, chiller, air compressor, drawing dies, pointing machine, cold welders, bobbins etc. with our machines.

Q: Could you do the design for the whole plant?
A: Yes, this is our advantage.
With the data sheet of cable to be produced, the standard your cables should follows, the productivity you expected. Our engineer on production technology and machinery will make design of production machines, test equipment, accessories like bobbins, dies, rewinding lines and materials needed.

Q: How can I know the status of my order?
A: We have our OA system on tracking the production.
For any of your request we can send photos and videos of your order, also we can use FACETIME to let you know the production.

Q: How do you work on the inspection before delivery?
A: We will make dynamic balance testing, levelness testing, noise testing, etc. during production.
After production finished, usually we make no-load running of each machine before delivery. Customers are welcomed to attend the inspection.

Q: What exhibitions will you attend, can we meet in the fair?
A: Dusseldorf International Wire and Cable Fair;
Wire South America Fair;
International Wire and Cable Fair in Shanghai;
International Istanbul Wire Fair, etc.
wire Southeast Asia Fair, etc.

Send your message to us:

Write your message here and send it to us
TOP