We've been proud with the significant shopper fulfillment and wide acceptance due to our persistent pursuit of top of the range both of those on solution and repair for Wire Butt Welder, Take Up And Traverse, Wire Drawing Machine Price, We sincerely hope to serve you and your business with a good start. If there is anything we can do for You, we shall be more than pleased to do so. Welcome to our factory for visit.
2019 Good Quality Hv Test - Cable Heating Cycle Test System – LINT TOP Detail:

1. Introduction

The heavy current is used for testing power transformer, high voltage mutual inductor, arrester, high voltage XLPE cable and so on. It adopts heavy current load test to test sample with heavy current for judging the quality so that users can improve products quality.

2. Environment

1. Maximum altitude: 1500m
2. Temperature range: -5-+35℃
3. Relative humidity(non-condensing): ≤90%
4. Temperature range of electronic component: 10-+40℃
5. Relative humidity of electronic component(non-condensing): ≤80%

3. Technical Parameters

1. Input voltage: 220V  380V
2. Output voltage: 2V-100V (and above)
3. Rated current: 100A-12000A (and above)
4. Rated frequency: 50Hz/60Hz
5. Typical noise: ≤ 75dB (Measuring 2 meters away equipment)
6. Operation duty: Continuously


Product detail pictures:


Related Product Guide:

With reliable quality process, good reputation and perfect customer service, the series of products produced by our company are exported to many countries and regions for 2019 Good Quality Hv Test - Cable Heating Cycle Test System – LINT TOP , The product will supply to all over the world, such as: Dominica, European, Hyderabad, We have won a good reputation among overseas and domestic clients. Adhering to the management tenet of "credit oriented, customer first, high efficiency and mature services", we warmly welcome friends from all walks of life to cooperate with us.

FAQ

Q: Can I visit your factory?

A: All the customers from both home and abroad are warmly welcomed to visit our company and factory.

Q: Do you supply the installation and commissioning?
A: Yes, we do as followings:
-As soon as customer informed us the machines are put in the right place, we will send both mechanical and electrical engineer for machine start up.
-No-load testing: After machine installed completely, we make no-load testing first.
-With-load testing: Usually we will can produce 3 different wires to make load testing.

-Acceptance report: After the buyer confirms that machine can reach all specification under contract, the acceptance report will be signed for our record that machine will be in guarantee period.

Q: What information should I offer to get a detailed quotation from you?
A: For single machine: Usually we need to know inlet wire size, outlet wire size to be produced, productivity, pay off and take up size to choose the right machine.
For new cable plant or new cable production line, we need to know the datasheet of cables to be produced, the productivity, the standards to be followed, etc to design all machines needed.

Q: Can you supply the auxiliary equipment along with the machines?
A: Yes, definitely.
We has supplied heat exchanger, copper/aluminum powder filter machine, cooling tower, chiller, air compressor, drawing dies, pointing machine, cold welders, bobbins etc. with our machines.

Q: Could you do the design for the whole plant?
A: Yes, this is our advantage.
With the data sheet of cable to be produced, the standard your cables should follows, the productivity you expected. Our engineer on production technology and machinery will make design of production machines, test equipment, accessories like bobbins, dies, rewinding lines and materials needed.

Q: How can I know the status of my order?
A: We have our OA system on tracking the production.
For any of your request we can send photos and videos of your order, also we can use FACETIME to let you know the production.

Q: How do you work on the inspection before delivery?
A: We will make dynamic balance testing, levelness testing, noise testing, etc. during production.
After production finished, usually we make no-load running of each machine before delivery. Customers are welcomed to attend the inspection.

Q: What exhibitions will you attend, can we meet in the fair?
A: Dusseldorf International Wire and Cable Fair;
Wire South America Fair;
International Wire and Cable Fair in Shanghai;
International Istanbul Wire Fair, etc.
wire Southeast Asia Fair, etc.

Send your message to us:

Write your message here and send it to us